仔细阅读并遵照本综述以及所使用的快速接头的专用说明。
● 快速接头的使用者应具有充分的资质。
● 确保快速接头满足使用要求并且未在运输过程中受到损坏。
● 安装前、仔细检查确认实际产品与需要的产品编码是否一致。
● 安装前清理过渡接头及软管,防止杂物进入液压系统以及由
此造成的密封件损伤。
● 根据使用温度及介质选择合理的密封件。
● 快速接头的最大工作压力大于等于系统压力的峰值。
● Read carefully the assembly and safety instructions
● Installation of Quick Couplings can be only done by well qualifiedpersonnel
● Check whether the product meets the requirement and if it has beendamaged
during transport
● Ensure that quick coupling is suitable for installation, required
pressure,connection, flow characteristic and is compatible with the medium
used.
● Before installation clean up hose and pipes.
● Check that line temperature work within permitted limitse
● Verify if maximal working pressure is equal or higher than the peakpressures
of the application.
● Verify that the number of cycle impulses of the product is compatiblewith